NEWSLETTERS
RPI® COC
303-385-0386
CONTACT US
Would You Like Your Site Evaluated?
Home
APPROACH
RPI Group
INSTALLATION
ABOUT
SUPPORT LAB
RPI® COC
USDA Permit
PRODUCTS
BOS 100®
BOS 200®
CAT 100
BOS 200+®
LEARN WITH RPI
ZVI (ZERO VALENT IRON) AND ACTIVATED CARBON INTEGRATION LED TO THE EMERGENCE OF THE SYNERGY SOUGHT BUT NOT FOUND IN ZVI MIXTURES
CASE STUDIES
Beneath the Surface
VIDEOS
Home
APPROACH
RPI Group
INSTALLATION
ABOUT
SUPPORT LAB
RPI® COC
USDA Permit
PRODUCTS
BOS 100®
BOS 200®
CAT 100
BOS 200+®
LEARN WITH RPI
ZVI (ZERO VALENT IRON) AND ACTIVATED CARBON INTEGRATION LED TO THE EMERGENCE OF THE SYNERGY SOUGHT BUT NOT FOUND IN ZVI MIXTURES
CASE STUDIES
Beneath the Surface
VIDEOS
RPI
®
VIDEO TOOLKIT
THE RPI
®
GROUP APPROACH
SUPPORT LABORATORY
WEBINARS
BOS 200+ What’s New For Hydrocarbons
High Resolution Site Characterization HRSC For Remedial Design and Evaluation
Trap and Treat CAT 100 Five Year Review
What is Direct Interspecies Electron Transfer, and Why Do I Care? Your DIET Strategy for the New Year
The Impact of Particle Size on Activated Carbon-Based Amendments
Working Smarter, Not Harder, to Characterize Fractured Bedrock
Drilling Down on the Trap and Treat® Approach Part 1 – Solvent Remediation
Drilling Down on the Trap and Treat® Approach Part 2 – Petroleum Hydrocarbons Remediation
The Pre-Drill Methodology: Overcoming Unconsolidated DPT Refusal
What’s Our Secret? 19 Years of Remediation Success with the Trap & Treat Approach
Activated Carbon In-Situ: Exposing The Truth About Trap & Treat and Rollover
DIET Strategy + Activated Carbon = Geobacter Smorgasbord at CVOC Sites
Accelerated CVOC Remediation Using BOS 100/CAT 100 and The Secret to DNAPL Treatment
Expedited Petroleum Hydrocarbon Remediation Using BOS 200 and Getting Rid of LNAPL
Leveraging the Remedial Design Characterization (RDC) Process to Develop Surgical Designs and Manage Expectations
Slurry Injection in Overburden and Challenging Geology- Best Practices, Applications, and the Pre-Drill Method
Fractured Bedrock Slurry Injection Best Practices and Applications- “What Is A Triplex?”
PRB Design and Installation- Reducing Mass Flux By Promoting Contact In Situ