Achieve effective industrial site remediation while maintaining uninterrupted operations. For many manufacturing facilities, traditional cleanup methods are too invasive, too slow, or too costly to implement alongside active production.
In situ remediation keeps your operations moving. Treating contaminants directly in soil and groundwater eliminates the need for excavation or shutdowns, keeping your facility running while cleanup progresses.
RPI® specializes in designing and implementing targeted in situ remediation solutions for manufacturing sites. Our technology helps environmental remediation professionals deliver safe, effective, and compliant outcomes.
Industrial sites often contain persistent and difficult-to-treat contaminants, particularly chlorinated solvents such as PCE, TCE, and harmful daughter products. These compounds can migrate through soil and groundwater, creating long-term environmental and regulatory challenges.
RPI®‘s BOS 100® and CAT 100 are engineered to address chlorinated solvent treatment at manufacturing sites. Activated carbon traps contaminants in place to prevent further migration, and zero-valent iron promotes reductive dechlorination to degrade contaminants. The dual-action approach provides complete treatment without generating hazardous degradation products. This results in a more thorough and lasting remediation outcome.
We tailor our solutions to your specific site challenges, from infrastructure constraints to contaminant profiles, and support effective, site-specific remediation strategies.
Large manufacturing sites with complex layouts, limited access points, and variable subsurface conditions can make traditional remediation methods impractical or inefficient.
Our in situ solutions enable targeted delivery of treatment media without disrupting operations. In addition to chlorinated solvents, we also support the remediation of petroleum hydrocarbons commonly found at manufacturing and processing sites. BOS 200® and BOS 200+® products are perfect for petroleum-based contaminants from fuel spills or other industrial processes.
High concentrations of PCE are commonly found at industrial dry cleaning sites and are difficult to treat. These conditions can pose significant risks to groundwater and indoor air quality if not properly addressed.
RPI®‘s technologies are well-suited to these environments. They allow remediation professionals to stabilize and treat high-strength contamination in place. By addressing industrial site contamination at the source, our solutions help reduce risk, improve site conditions, and support regulatory compliance.
Our technology is proven in the field at sites just like yours. At one active manufacturing facility with challenging space limitations and constant forklift traffic, we achieved 88-99% PCE reduction in just three weeks while operations continued uninterrupted.
In another project, remediation at a dry cleaning facility effectively addressed high-concentration PCE impacts and supported long-term site management roles.
When an industrial property in Canada was stalled in a real estate transaction due to chlorinated solvent impacts, we provided the ideal solution for their short time frame. The site had two distinct groundwater plumes contaminated with chlorinated volatile organic compounds (cVOCs), including chlorinated ethenes and ethanes. Using targeted BOS 100® injections, the site achieved its remedial goals on time, allowing the transaction to close successfully.
As with these projects, RPI® can help you achieve the same results — meet regulatory goals, protect property value, and move sites toward closure.
Deliver effective treatment of challenging contaminants like PCE and TCE without disrupting operations. With targeted, in situ remediation for industrial and manufacturing sites, you get long-term remediation results and a clear, reliable path to regulatory compliance.
Contact RPI® online or call us at 303-385-0386 today to discuss your project and receive a tailored estimate for your site.